S620
High build zinc phosphate primer
Literature download pdf
Application Notes download pdf
Properties Pack Single
Area of Use Internal & External
Substrate Black Steel
SG 1.33
Volume Solids 40%
Flash Point 23°C
Colour Red
Technical Preparation Grit blast steel to SA2 1/2 or equivalent
WFT / Coat um 125-188
DFT / Coat um 50-75
Drying Times Touch dry: 1 hour Hard dry:4-6 hours
Over Coating With basecoat after 12 hours
Coverage 5.3m2/ltr @ 75um DFT
Application Method Airless spray, roller and brush