S620
High build zinc phosphate primer
Literature
Application Notes
Properties Pack Single
Area of Use Internal & External
Substrate Black Steel
SG 1.26
Volume Solids 43%
Flash Point 21-32°C
Colour Red or Grey
Technical Preperation Grit blast steel to SA2 1/2 or equivalent
WFT / Coat um 120-180
DFT / Coat um 50-75
Drying Times Touch dry: 15-35 minutes Hard dry:1-2 hours
Over Coating With basecoat after 12 hours
Coverage 5.7m2/ltr @ 180um WFT
Application Method Convensional airless spray roller and brush